More cupboard mounting (and a fright).
4/23/19 Building Summary: Today I measured out, marked, leveled, and hung both the second and third cupboards. This was followed […]
More cupboard mounting (and a fright). Read More »
4/23/19 Building Summary: Today I measured out, marked, leveled, and hung both the second and third cupboards. This was followed […]
More cupboard mounting (and a fright). Read More »
4/22/19 Building Summary: Today I measured out, marked, mounted, and then leveled the first cupboard. This was followed by an
First cupboard up (and a tight fit). Read More »
4/21/19 Building Summary: Today, I put together the second 30″h by 36″w by 12″d cupboard, checked beefers with Padre, and
Cupboard crafting (and a mini-blue). Read More »
4/20/19 Building Summary: Today I initiated the morning by attempting to tighten the water heater’s lefthand brass fitting which was
The cupboarding begins. Read More »
4/19/19 Building Summary: Today I started off by bringing and unloading the ready-to-assemble cabinets at Jacobhouse. This was followed by
Them fittin’s got brass, bendin’ up like that. Read More »
4/18/19: Building Summary: Today, I began my time at Jacobhouse by straightening the edge of the wall between the kitchen
A perfect edge, and moo-re neighbors. Read More »
4/17/19 Building Summary: I worked on Jacobhouse both in the morning and afternoon today, so I’ll split the following section
Extra time at Jacobhouse (and wren update). Read More »
Building Summary: Today I finished flooring the closet-space between the kitchen and bathroom. This was followed by my adding additional
Closet-floor down (and a sore thumb). Read More »
4/15/19 Building Summary: Today I started off by measuring and cutting three lengths of 2×4 along with a small piece
Supply run (and watermelon). Read More »
4/14/19 Building Summary: Today I measured, marked, and with Padre’s help, cut the angled piece of plywood for the bathroom’s
The Privy Plank and Morshrooms. Read More »