Cable work and closet-wall schematics.
6/19/19 (Above: Jacobhouse’s panel box with newly arrived cables jutting from its central bottom hole.) Building Summary: Today, I began […]
Cable work and closet-wall schematics. Read More »
6/19/19 (Above: Jacobhouse’s panel box with newly arrived cables jutting from its central bottom hole.) Building Summary: Today, I began […]
Cable work and closet-wall schematics. Read More »
6/18/19 (Above: An image taken as we were pulling out of Home Depot with a van full of cargo.) Building
A successful campaign against the rain. Read More »
6/17/19 (Above: Conduit leaving Jacobhouse and entering the meter’s panel box.) Building Summary: Today I began by measuring, retrieving, and
Wirin’ the wire in (and a functioning shower). Read More »
6/16/19 (Above: An image that Padre captured while I was bent over the shower drain applying some silicone gasket maker.
The shower drain (and frantic finagling). Read More »
6/15/19 (Above: The now fully closed-in Wall #6.) Building Summary: Today I started off by trimming away the excess spray
Another hole (and lazy bovines). Read More »
6/14/19 (Above: The liberally spray-foamed Wall #6. I don’t think there will be many bugs getting in that way.) Building
Sealing Wall #6 (and foam eruptions). Read More »
6/13/19 (Above: Padre and Jacob reflected in the fully caulked sliding glass door.) Building Summary: Today I did not get
Caulking Wall #6, Day 2 (and more rain). Read More »
6/12/19 (Above: The almost fully caulked Wall #6.) Building Summary: Today I caulked almost the entire exterior of Wall #6.
Caulking Wall #6 (and quickly). Read More »
6/11/19 (Above: The now fully-trimmed Wall #6.) Building Summary: Today I started off by re-setting up the under-oak worktable, and
All trimmed up (and ready for the caulk-king). Read More »
6/10/19 (Above: Me being [unknowingly] photographed putting up a PVC trim-board.) Building Summary: Today I began installing PVC trim boards
Trimming Wall #6 (And a 2:40 PM Update) Read More »