Fifth light in (and an oops.)
7/8/19 (Above: Light #5 [this is including kitchen indoor/outdoor lights] is now installed as is another 3’x8′ piece of ‘wall’ […]
Fifth light in (and an oops.) Read More »
7/8/19 (Above: Light #5 [this is including kitchen indoor/outdoor lights] is now installed as is another 3’x8′ piece of ‘wall’ […]
Fifth light in (and an oops.) Read More »
7/7/19 (Above: A miniature cable clamp used to hold together the ‘safety-strap’ on the north postern door.) Building Summary: Today
Mini-clamp, more galvalume, and the bed light. Read More »
7/6/19: (Above: The major portion of Wall #5’s west-side paneling is now fastened in place.) Building Summary: Today I began
More paneling (and pseudo-fritters). Read More »
7/5/19 (Above: The office light, switch, and paneling installed on Closet-wall’s east side.) Preface: Today was quite a long and
A day well-filled. Read More »
Written by Jacob VanWagner; told by Hattun the Madcap. (Above: Highhold, and the Bloodboulder Span.) Preface: This story is an
The Tale of Higglin Highhold Read More »
7/4/19 (Above: The first rivet I have ever installed within Jacobhouse. To think I was learning to how to take
First wall covered – a riveting experience. Read More »
7/3/19 (Above: The first piece of galvalume paneling cut for Wall #6 of Jacobhouse [the right side].) Building Summary: Today’s
Cutting the paneling (and new tools). Read More »
7/2/19 (Above: The fridge and oven are now in their final positions, waiting patiently to fulfill their functions.) Building Summary:
Utilizing old materials in new endeavors. Read More »
7/1/19 (Above: The Padre-fabricated connector between 1/2″ CPVC to the refrigerator.) Building Summary: Today, Padre and I started by testing
More miscellany (and power’s out again). Read More »
6/30/19 (Above: The fridge bridge allowing full access to Jacobhouse’s postern wall.) Building Summary: Today I started off by measuring,
Bathroom shelves (and the fridge bridge). Read More »