Provisioning Jacobhouse.
10/8/19 Building Summary: Today’s primary Jacobhouse activity consisted of a run to town with Madre whereupon I procured quite a […]
Provisioning Jacobhouse. Read More »
10/8/19 Building Summary: Today’s primary Jacobhouse activity consisted of a run to town with Madre whereupon I procured quite a […]
Provisioning Jacobhouse. Read More »
10/7/19 (Above: This is the uncovered LED kitchen light. [Finally removed the cover to clean away debris that had collected
Mopping the ceiling. Read More »
10/6/19: (Above: Every morning I see this, I look forward to living here even more.) Active Summary: My time at
Fall cleaning continues. Read More »
10/5/19 (Above: Trim placed along the interior side of the bathroom’s pocket jamb. It is almost invisible because of the
Trimming the pocket jamb. Read More »
10/4/19 (Above: The first load of clothing cleaned and dried at Jacobhouse.) Building Summary: Today was ‘appliance testing day’. I
Appliance testing day. Read More »
10/3/19 (Above: Me, fresh out of my first [actual] shower within Jacobhouse.) Building Summary: This day’s Jacobhouse activities consisted of
(Above: The panel box face plate in place [but not fastened in… that will come tomorrow].) 10/2/19 Building Summary: This
A cover for the panel-box. Read More »
10/1/19 (Above: An image of the freshly placed window sill. I took some ‘chiselling’ along the postern edges to make
Concrete counter…sill? Read More »
9/30/19 (Above: An afternoon’s worth of work fastening all of the morning’s PVC ‘lumber’ in place.) Building Summary: This morning’s
Entry interior almost finished! Read More »
9/29/19 (Above: The freshly painted face-plate destined for the kitchen light switches.) Preface: I plan on making a delicious and
The faceplate’s faceplate. Read More »