Cleaning up the place (and a new chair).
9/28/19 (Above: This [the brown board] is the freshly painted and installed spacer for the bathroom’s pocket door.) Building Summary: […]
Cleaning up the place (and a new chair). Read More »
9/28/19 (Above: This [the brown board] is the freshly painted and installed spacer for the bathroom’s pocket door.) Building Summary: […]
Cleaning up the place (and a new chair). Read More »
9/27/19 (Above: Jacoboffice.) Building Summary: This morning’s activities consisted of three primary tasks: fastening in the turquoise galvalume trim, vacuuming
Galvalume trim (and BBQ sauce). Read More »
9/26/19 (Above: A closeup of the now-painted galvalume trim. I quite like the texturing that was produced via the spray-paint
Galvalume trim (and cattails). Read More »
9/25/19 (Above: A photogenic picture of the galvalume I used to create pieces of trim today. The glove’s position makes
9/24/19 (Above: The fully functional kitchen sink within Jacobhouse.) Building Summary: This morning’s activities at Jacobhouse began with my installing
Kitchen faucet and DSL in. Read More »
9/23/19 (Above: The enclosed bathroom closet.) Building Summary: This morning’s Jacobhouse activities consisted solely of my adding trim around the
Trimming doors and cooking kabocha. Read More »
9/22/19 (Above: Jacobhouse’s closet-wall fully enclosed.) Building Summary: This morning began with my fastening on the wheel to the base
Enclosing the closet-wall. Read More »
9/21/19 (Above: The painted face-plates / doors for the various unclad cabinets in Jacobhouse. My turquoise paint-bucket is getting close
Imperfection appreciation. Read More »
9/20/19 (Above: Jacobhouse patiently awaiting a resident.) Building Summary: Today I did not begin Jacobhouse activities until about 10:00 AM.
9/19/19 (Above: Freshly glued trim being held in place via multiple mechanical means. The PVC pipe was the final addition
Wood glue, construction glue, and nut glue. Read More »