Trimming time – all vertical pieces up!
10/15/19 (Above: Due to past-Jacob leaving about 1/4″ of galvalume jutting over the edge of the plywood on the Closet-wall’s […]
Trimming time – all vertical pieces up! Read More »
10/15/19 (Above: Due to past-Jacob leaving about 1/4″ of galvalume jutting over the edge of the plywood on the Closet-wall’s […]
Trimming time – all vertical pieces up! Read More »
10/14/19 (Above: A bathmat that mysteriously appeared in Jacobhouse’s bathroom.) Active Summary: This morning, I initiated Jacobhouse activity by planning
Time to trim! (An a mysterious bathmat.) Read More »
10/13/19 (Above: Less boxes in the kitchen. Goody.) Active Summary: This morning’s activities consisted of checking the beef pasture, collecting
Putting it all away. (Well… most of it.) Read More »
10/12/19: (Above: Noodles and salad – a perfect meal to offset a day of selling / sampling beef.) Active Summary:
A lengthy day (and a noodled finale). Read More »
10/11/19 (Above: The partially set-up Master Blend Beef booth, ready for Fall Fest 2019.) Active Summary: I spent this morning
Preparing for Fall-Fest. Read More »
10/10/19 (Above: An ole creepy spider Padre showed on our way back to old-house for the evening. Despite bearing a
Floor plan, more BBQ shenanigans, and a spider. Read More »
10/9/19 (Above: The move-in continues. As can be seen, more items from yesterday’s menagerie have been put away.) Building Summary:
Measurements and Authentic Polish Cuisine Read More »
10/8/19 Building Summary: Today’s primary Jacobhouse activity consisted of a run to town with Madre whereupon I procured quite a
Provisioning Jacobhouse. Read More »
10/7/19 (Above: This is the uncovered LED kitchen light. [Finally removed the cover to clean away debris that had collected
Mopping the ceiling. Read More »
10/6/19: (Above: Every morning I see this, I look forward to living here even more.) Active Summary: My time at
Fall cleaning continues. Read More »