The flooring begins.
4/6/19: Building Summary: Today I began the process of laying down and fastening the ¾-inch plywood floor. This included marking […]
The flooring begins. Read More »
These posts include content and news in regard to living in a container home.
4/6/19: Building Summary: Today I began the process of laying down and fastening the ¾-inch plywood floor. This included marking […]
The flooring begins. Read More »
4/5/19: Building Summary: Today, I started off by finishing the outlet installation in the office area*. This was followed by
Preparation Day (and a lichen). Read More »
4/4/19: Building Summary: Today at Jacobhouse, I installed outlets into all the vacant electrical boxes, and then I went down
Wiring Jacobhouse, Day 12 (Painting, too!) Read More »
4/3/19: Building Summary (Morning): Today I started off by installing the washer/dryer outlet box on the back side of the
Wiring Jacobhouse, Day 12. (And dust-blowing) Read More »
4/2/19: Building Summary: Today I installed the closet-wall’s four bracket boxes, threaded the appropriate wires into each of them, stripped
Wiring Jacobhouse, Day 11. Read More »
(Above: A squash flower growing right outside of Jacobhouse.) 4/1/19: Building Summary: Today started off with my setting up the
Big Supply Day for Jacobhouse Read More »
3/31/19: Building Summary: Today I wired in the porch light. This consisted of installing the mounting bracket, joining the wires
Wiring Jacobhouse, Day 10. :-) Read More »
3/30/19: Building Summary: Today Padre and I both contributed time to Jacobhouse. While he worked on the wiring for the
Wiring Jacobhouse, Day 9. Read More »
3/29/19: Building Summary: Today I started off by sturdying the frame I made yesterday. I did this by putting six
More wire work in Jacobhouse, Day 8. Read More »
3/28/19: Building Summary: Today I began the morning by adding to and completing my Home Depot list. The materials included:
Framing the panel box (and more spiders). Read More »