Closing in Wall #5 (and a return to the list).
6/28/19 (Above: The closed-in closet wall with half of its shelves in place. I cut the other half slightly too […]
Closing in Wall #5 (and a return to the list). Read More »
These posts include content and news in regard to living in a container home.
6/28/19 (Above: The closed-in closet wall with half of its shelves in place. I cut the other half slightly too […]
Closing in Wall #5 (and a return to the list). Read More »
6/27/19 (Above: One of the two pieces of plywood I cut for Wall #5. This is for the east side.)
Improving Wall #5 (and a shadeless shade). Read More »
6/26/19: (Above: Brace-boards, plywood, and shelving brackets all fastened in place.) Building Summary: Today I began by fastening on all
Shelving the closet-wall. Read More »
6/25/19 (Above: Plywood, 2x4s, and furring strips cut and ready for fastening to the closet-wall.) Building Summary: I started off
Cutting wood versus cuttin’ cattle. Read More »
6/24/19 (Above: Jacobhouse, standing stalwartly beneath the afternoon sun.) Building Summary: Today I started off by making plans with Padre
A bastion against the summer’s heat. Read More »
6/23/19 (Above: Wag mowing on the left, and Padre searching for hidden articles in the grass on the right.) Building
Lawncare (and multi-specie appreciation). Read More »
6/22/19 (Above: An exaggerated warning sign to notify visitors that there are now hot wires within Jacobhouse. As to this
Danger! High voltage (thanks Shae). Read More »
6/21/19 Building Summary: Today I began by turning off the electric at the outdoor pole and then by feeding fish
Smooth sliding (and fish-tape). Read More »
6/20/19 (Above: The newly wrought slide-out closet positioned in its intended home. Still needs to be lifted up into place.)
The slide-out closet (and a rapture). Read More »
6/19/19 (Above: Jacobhouse’s panel box with newly arrived cables jutting from its central bottom hole.) Building Summary: Today, I began
Cable work and closet-wall schematics. Read More »