Measuring Matter Matters
2/17/19: Building Summary: Today I assembled the frame extension for the entry to Jacobhouse. This included utilizing the boards I […]
Measuring Matter Matters Read More »
2/17/19: Building Summary: Today I assembled the frame extension for the entry to Jacobhouse. This included utilizing the boards I […]
Measuring Matter Matters Read More »
2/16/19: Building Summary: Today, I began the process of creating naturally finished wood. This consisted of my gathering together two
Naturally Finished Lumber. Read More »
2/15/2019: Building summary: Today was another planning day, but there shall be action on the morrow. I started out by
Electrical Planning, Day 2. (The Tape-Switch) Read More »
2/14/2019: Building Summary: Today was a planning day. It consisted of figuring out (at least partly) what I was going
Electrical Planning, Day 1 Read More »
2/13/19: Building Summary: Today I shimmed up the closet-wall, attached it to the floor, and with Padre’s help, leveled it
Closet-Wall, Day 4. (The Wagon Jack) Read More »
2/12/19: Building Summary: Today I measured, cut, and fastened supports to the closet-wall. In doing so, I made two wall
Closet-wall, Day 3. (The Wasp) Read More »
2/11/2019: Building Summary: Today I began the process of putting together Wall #5. This consisted of using a skillsaw to
Wall #5, Day 2. (Board games.) Read More »
2/10/19: Building Summary: Today I began the construction process on Wall #5, otherwise to be known as wardrobe-wall. I started
2/9/2019: Building Summary: Today was yet another day of planning and preparation. I started off the morning by clearing away
2/8/2019: Building Summary: Today was a cleaning and planning day. I started off by tidying up the mess I left
More planning (and delicious sandwiches). Read More »