Plied-wood (and an adjustable bracket box).
5/20/19 (Above: A rare sighting of Jacobhouse’s spirit.) Building Summary: Today I fastened plywood to the bathroom side of the […]
Plied-wood (and an adjustable bracket box). Read More »
5/20/19 (Above: A rare sighting of Jacobhouse’s spirit.) Building Summary: Today I fastened plywood to the bathroom side of the […]
Plied-wood (and an adjustable bracket box). Read More »
5/19/19 Building Summary: Today I started off at Jacobhouse by fixing the sail shade. This consisted of turning the entire
‘Boardering’ the shower (and shady workspace). Read More »
5/18/19 Building Summary: Today I caulked along the shower’s interior edges, some of it’s exterior edges, and I finished caulking
Jacobhouse’s first shower (and a burgersteak). Read More »
5/17/19 Building Summary: Today a large variety of tasks were completed at Jacobhouse. I started off by neatening the place
Pocket door frame (and not ‘caulking it up’). Read More »
5/16/19 (Above: It was a trial to make the utility hole larger for this beast’s hoses, but from the small
The A/C’s trial (and container lifting). Read More »
(Above: The flower of an elephant ear plant. Mostly scentless, but an intriguing sight.) 5/15/19 Building Summary: Morning activities entailed
Paint pylons planted (and an elephant flower). Read More »
Preface (10:34 PM): The entry below was written after a long day. Apologies for any discrepancies in quality. 5/14/19 Building
I’m finished stalling! Read More »
5/13/19 Building Summary: Today I was only able to work on Jacobhouse in the morning. However, during that time, I
How not to stall AND stall simultaneously. Read More »
5/12/19 Building Summary: Today I started off by fastening the interior side of Wall #1 in place. This was followed
5/11/19 Building Summary: Today I started off by measuring, marking, and cutting a piece of ½” plywood for the interior
Notice: walls enclosed (and a lady bug). Read More »