Freekend 2, Day 2 (and some fungi).
6/9/19 (Above: Cows having a lazy Sunday morning beneath a stormy sky.) Commentary: Freekend, Day 2. Need I write more? […]
Freekend 2, Day 2 (and some fungi). Read More »
6/9/19 (Above: Cows having a lazy Sunday morning beneath a stormy sky.) Commentary: Freekend, Day 2. Need I write more? […]
Freekend 2, Day 2 (and some fungi). Read More »
6/8/19 (Above: Cows enjoying their own freekend… Oh wait, that’s every day.) Commentary: It has been a relaxing and quite
Second Freekend (Day 1). Read More »
6/7/19 (Above: Jacobhouse to the left. Bee-hole to the right. Jacob and Wag to the far right in the background.)
Jacobhouse from above (and the bee-hole). Read More »
6/6/19 Building Summary: Today I began by measuring, marking, and cutting plywood for the inside of Wall #6. This was
Stuffing Wall #6 (and bee-friendly, please). Read More »
6/5/19 (Above: Jacobhouse… flashing its posterior.) Building Summary: Today I started off the morning by adding flashing above the sliding
More flashing for Wall #6 (and the DSL Jack). Read More »
6/4/19: (Above: The two strips of flashing I fastened to Wall #6.) Building Summary: This morning started off with my
Bright flashing, but dark light. Read More »
6/3/19 (Above: Wooden mounts to which the kitchen light shall be fastened.) Building Summary: Today I started off by preparing
Flooring ordered (and kitchen light mounts). Read More »
6/2/19 (Above: Early morning sun shining into Jacobhouse and reflecting from the stainless walls.) Building Summary: Today I started off
Fitting the soffit (and more measurements). Read More »
6/1/19: (Above: The office of Jacobhouse with all plywood back in place and with DSL line successfully run from front
And that’s why we glue the conduit. Read More »
5/31/19 (Above: The final floorboard is now fastened in place.) Building Summary: Today began with my measuring, marking, and cutting
Final floorboard (and internet supplies). Read More »