Colorado, Day 2.
7/17/19: (Above: ME in Colorado Springs, CO.) Vacation Status: I’m probably tending to quite a number of interesting activities while […]
7/17/19: (Above: ME in Colorado Springs, CO.) Vacation Status: I’m probably tending to quite a number of interesting activities while […]
7/16/19: (Above: The freshly fastened above-shower galvalume as well as the newly installed lengthy pane to the left of the
The longest stretch (and Colorado soon!) Read More »
7/15/19 (Above: Jacobhouse’s bathroom lit by a new light-source.) Building Summary: Today I began by slotting in and measuring the
7/14/19: (Above: The tentative hookups for dryer/steam hoses atop the container home’s shower stall.) Building Summary: Today I began the
7/13/19: (Above: The final Galvalume panel is now in place within Jacobhouse. All that remains are some ‘specialty fits’ here
All panels up and all receptacles in! Read More »
Written by Jacob VanWagner Preface: The process of composing Breakneck Bill is what made me realize that short-stories are not
7/12/19 (Above: A picture displaying the completed curve-corner within Jacobhouse’s bathroom as well as the abode’s overall luster.) Building Summary:
Shiny house (and the curve-corner). Read More »
7/11/19: (Above: Galvalume now completely surrounds the interior and exterior of the bathroom door. To add to this, Light #6
Light #6 (and more galvalume, of course). Read More »
7/10/19 (Above: The now wired breakers within Jacobhouse and a corresponding label list.) Building Summary: Today I began by connecting
Electric soon! (And galvalume benefits). Read More »
7/9/19 (Above: The hall’s left [north] side is now clad entirely in galvalume paneling.) Building Summary: Today I began by
Wall #2 – Exterior Paneled (and Lamb Farfalle) Read More »