Trim (and another crudely drawn plan).
5/23/19 (Above: The pocket door entrance with all framing now covered.) Building Summary: Today I applied the pieces of plywood […]
Trim (and another crudely drawn plan). Read More »
5/23/19 (Above: The pocket door entrance with all framing now covered.) Building Summary: Today I applied the pieces of plywood […]
Trim (and another crudely drawn plan). Read More »
5/22/19 (Above: Now, the bathroom and its walls are almost entirely closed in. All that remains are the two small
Many screws (and a new landscape). Read More »
5/21/19 Building Summary: My morning at Jacobhouse was divided into two clearly defined portions (split by a pleasant Segway ride
Pocket-door fully enclosed (and lime seltzer). Read More »
5/20/19 (Above: A rare sighting of Jacobhouse’s spirit.) Building Summary: Today I fastened plywood to the bathroom side of the
Plied-wood (and an adjustable bracket box). Read More »
5/19/19 Building Summary: Today I started off at Jacobhouse by fixing the sail shade. This consisted of turning the entire
‘Boardering’ the shower (and shady workspace). Read More »
5/18/19 Building Summary: Today I caulked along the shower’s interior edges, some of it’s exterior edges, and I finished caulking
Jacobhouse’s first shower (and a burgersteak). Read More »
5/17/19 Building Summary: Today a large variety of tasks were completed at Jacobhouse. I started off by neatening the place
Pocket door frame (and not ‘caulking it up’). Read More »
5/16/19 (Above: It was a trial to make the utility hole larger for this beast’s hoses, but from the small
The A/C’s trial (and container lifting). Read More »
(Above: The flower of an elephant ear plant. Mostly scentless, but an intriguing sight.) 5/15/19 Building Summary: Morning activities entailed
Paint pylons planted (and an elephant flower). Read More »
Preface (10:34 PM): The entry below was written after a long day. Apologies for any discrepancies in quality. 5/14/19 Building
I’m finished stalling! Read More »