Fitting the soffit (and more measurements).
6/2/19 (Above: Early morning sun shining into Jacobhouse and reflecting from the stainless walls.) Building Summary: Today I started off […]
Fitting the soffit (and more measurements). Read More »
6/2/19 (Above: Early morning sun shining into Jacobhouse and reflecting from the stainless walls.) Building Summary: Today I started off […]
Fitting the soffit (and more measurements). Read More »
6/1/19: (Above: The office of Jacobhouse with all plywood back in place and with DSL line successfully run from front
And that’s why we glue the conduit. Read More »
5/31/19 (Above: The final floorboard is now fastened in place.) Building Summary: Today began with my measuring, marking, and cutting
Final floorboard (and internet supplies). Read More »
5/30/19 (Above: Despite the morning’s early tribulations, Jacobhouse’s sliding glass doors are now soundly in place.) Building Summary: Today I
The window wall (and an upside-down incident). Read More »
5/29/19 (Above: The postern side of Jacobhouse with the freshly stapled and taped vapor barrier.) Building Summary: Today I started
Taping Wall #6, and a frame within a frame. Read More »
5/25/19 (Above: Wall #6’s frame with plastic partly stapled on… Notice how all the shade falls to right side of
Waterproofing Wall #6 (and a leaping Wagyu). Read More »
5/27/19 (Above: This is a picture of Wall #6 from the inside. The doors were closed during a test to
Wall #6 fastened and fortified. Read More »
5/26/19 Building summary: Today I began by applying the top RO* board to Wall #6’s frame. This was followed by
Wall #6 placed (and a disconsolate cow). Read More »
5/25/19 (Above: The assembled outer frame of Wall #6.) Building Summary: Today I retrieved and cut a couple more 2x6s
Wall #6, Day 2 (and stuffed peppers). Read More »
5/24/19: (Above: The four non-plywood boards are those that are destined to support Wall #6.) Building Summary: The first portion
Wall #6, Day 1 (and a french omelet). Read More »