Third time’s the charm.
8/16/19 (Above: The third air-conditioner to grace Jacobhouse. It is the cheapest unit thus far, yet it was the easiest […]
Third time’s the charm. Read More »
8/16/19 (Above: The third air-conditioner to grace Jacobhouse. It is the cheapest unit thus far, yet it was the easiest […]
Third time’s the charm. Read More »
8/15/19 (Above: The fortified Jacobhouse is now held in place by two chains per corner.) Building Summary: Yesterday evening, I
Fortifying Jacobhouse. Read More »
8/14/19 (Above: A look under the lid of a now not-so-secret treasure chest.) Building Summary: Today I started off my
Two steps forward, and one step back. Read More »
8/13/19: (Above: The newly re-positioned portable A/C. For being portable, it sure was a hassle to move!) Building Summary: Today
More leaks, planning, and ants. Read More »
8/12/19: (Above: The plumbed in vanity sink. It almost looks professional.) Preface: Really roughin’ it tonight. It’s late, and brain
Jacobhouse needs to breathe. Read More »
8/11/19: (Above: The fully caulked toilet and vanity sink in Jacobhouse. I’ll be neatening edges with a utility knife after
Vanity in place (and a delicious steak). Read More »
8/10/19 (Above: The toilet within Jacobhouse’s bathroom along with lengthened vanity sink stub-ups.) Building Summary: Today I began by hooking
Manual labor (and a flushing toilet). Read More »
8/9/19 (Above: An amassment of supplies for Jacobhouse belit by late-noon sun beam.) Building Summary: This morning at Jacobhouse, I
Lifting many things. Read More »
8/8/19 (Above: The toilet now installed within Jacobhouse’s bathroom.) Preface: Apologies in advance for any grammar / spelling discrepancies; it’s
8/7/19: (Above: The result of flange-morning.) Building Summary: I left old-house a bit late this morning due to rainy weather.