Kitchen Counter, Part 3 (Sub-counter).
8/19/19 (Above: This is the stencil I made to easily discover / cut the angle I desired in the frontal […]
Kitchen Counter, Part 3 (Sub-counter). Read More »
8/19/19 (Above: This is the stencil I made to easily discover / cut the angle I desired in the frontal […]
Kitchen Counter, Part 3 (Sub-counter). Read More »
8/18/19 (Above: In my haste to depart, I forgot to take pictures of Jacobhouse. This is an image Padre took
Kitchen Counter, Part 2 (and noodles). Read More »
8/17/19 (Above: The eastern support I added to the kitchen sink’s base cabinet.) Building Summary: Today I began by planning
The Kitchen Counter, Part 1. Read More »
8/16/19 (Above: The third air-conditioner to grace Jacobhouse. It is the cheapest unit thus far, yet it was the easiest
Third time’s the charm. Read More »
8/15/19 (Above: The fortified Jacobhouse is now held in place by two chains per corner.) Building Summary: Yesterday evening, I
Fortifying Jacobhouse. Read More »
8/14/19 (Above: A look under the lid of a now not-so-secret treasure chest.) Building Summary: Today I started off my
Two steps forward, and one step back. Read More »
8/13/19: (Above: The newly re-positioned portable A/C. For being portable, it sure was a hassle to move!) Building Summary: Today
More leaks, planning, and ants. Read More »
8/12/19: (Above: The plumbed in vanity sink. It almost looks professional.) Preface: Really roughin’ it tonight. It’s late, and brain
Jacobhouse needs to breathe. Read More »
8/11/19: (Above: The fully caulked toilet and vanity sink in Jacobhouse. I’ll be neatening edges with a utility knife after
Vanity in place (and a delicious steak). Read More »
8/10/19 (Above: The toilet within Jacobhouse’s bathroom along with lengthened vanity sink stub-ups.) Building Summary: Today I began by hooking
Manual labor (and a flushing toilet). Read More »