Danger! High voltage (thanks Shae).
6/22/19 (Above: An exaggerated warning sign to notify visitors that there are now hot wires within Jacobhouse. As to this […]
Danger! High voltage (thanks Shae). Read More »
6/22/19 (Above: An exaggerated warning sign to notify visitors that there are now hot wires within Jacobhouse. As to this […]
Danger! High voltage (thanks Shae). Read More »
6/21/19 Building Summary: Today I began by turning off the electric at the outdoor pole and then by feeding fish
Smooth sliding (and fish-tape). Read More »
6/20/19 (Above: The newly wrought slide-out closet positioned in its intended home. Still needs to be lifted up into place.)
The slide-out closet (and a rapture). Read More »
6/19/19 (Above: Jacobhouse’s panel box with newly arrived cables jutting from its central bottom hole.) Building Summary: Today, I began
Cable work and closet-wall schematics. Read More »
6/18/19 (Above: An image taken as we were pulling out of Home Depot with a van full of cargo.) Building
A successful campaign against the rain. Read More »
6/17/19 (Above: Conduit leaving Jacobhouse and entering the meter’s panel box.) Building Summary: Today I began by measuring, retrieving, and
Wirin’ the wire in (and a functioning shower). Read More »
6/16/19 (Above: An image that Padre captured while I was bent over the shower drain applying some silicone gasket maker.
The shower drain (and frantic finagling). Read More »
6/15/19 (Above: The now fully closed-in Wall #6.) Building Summary: Today I started off by trimming away the excess spray
Another hole (and lazy bovines). Read More »
6/14/19 (Above: The liberally spray-foamed Wall #6. I don’t think there will be many bugs getting in that way.) Building
Sealing Wall #6 (and foam eruptions). Read More »
6/13/19 (Above: Padre and Jacob reflected in the fully caulked sliding glass door.) Building Summary: Today I did not get
Caulking Wall #6, Day 2 (and more rain). Read More »