Light #6 (and more galvalume, of course).
7/11/19: (Above: Galvalume now completely surrounds the interior and exterior of the bathroom door. To add to this, Light #6 […]
Light #6 (and more galvalume, of course). Read More »
7/11/19: (Above: Galvalume now completely surrounds the interior and exterior of the bathroom door. To add to this, Light #6 […]
Light #6 (and more galvalume, of course). Read More »
7/10/19 (Above: The now wired breakers within Jacobhouse and a corresponding label list.) Building Summary: Today I began by connecting
Electric soon! (And galvalume benefits). Read More »
7/9/19 (Above: The hall’s left [north] side is now clad entirely in galvalume paneling.) Building Summary: Today I began by
Wall #2 – Exterior Paneled (and Lamb Farfalle) Read More »
7/8/19 (Above: Light #5 [this is including kitchen indoor/outdoor lights] is now installed as is another 3’x8′ piece of ‘wall’
Fifth light in (and an oops.) Read More »
7/7/19 (Above: A miniature cable clamp used to hold together the ‘safety-strap’ on the north postern door.) Building Summary: Today
Mini-clamp, more galvalume, and the bed light. Read More »
7/6/19: (Above: The major portion of Wall #5’s west-side paneling is now fastened in place.) Building Summary: Today I began
More paneling (and pseudo-fritters). Read More »
7/5/19 (Above: The office light, switch, and paneling installed on Closet-wall’s east side.) Preface: Today was quite a long and
A day well-filled. Read More »
Written by Jacob VanWagner; told by Hattun the Madcap. (Above: Highhold, and the Bloodboulder Span.) Preface: This story is an
The Tale of Higglin Highhold Read More »
7/4/19 (Above: The first rivet I have ever installed within Jacobhouse. To think I was learning to how to take
First wall covered – a riveting experience. Read More »
7/3/19 (Above: The first piece of galvalume paneling cut for Wall #6 of Jacobhouse [the right side].) Building Summary: Today’s
Cutting the paneling (and new tools). Read More »