6/9/19
(Above: Cows having a lazy Sunday morning beneath a stormy sky.)
Commentary: Freekend, Day 2. Need I write more? No, but I will. Firstly, I will state that the game, Path of Exile, has done a superb job with it’s new patch, and it has granted me a very enjoyable weekend thus far. Secondly, I will state that I am quite ready to begin work on the container home once again – even moreso now that I have something of a plan that I can follow to completion. After today, it will be Jacobhouse every morning until July 16 when I head out west on a short trip to see my brother. The objective is to see how much I can get done between now and then.
Here is the almost completed list. I will likely have more specifics to add in the future, but this is the general idea of the chronological order:
- Finish Wall #6
- Trim outside with PVC trim / caulk
- Sprayfoam cracks on inside.
- Plywood inside.
- Shower drain (already have).
- Doesn’t have to be done at this step, just needs to be done before flooring begins.
- Closet-wall (First priority because I need to do this so I can put up the (steel) paneling and then the fixtures.)
- Build the pull out wardrobe
- Already have drawer slides, need lumber / hanger rack / plan to create the actual pull-out
- Shelves should also be made for the back section, because it will be much easier to work in that space without the plywood in place.
- Build the pull out wardrobe
- Finish up the front
- Complete the soffit
- Cover and trim around the entire door and window area.
- Panel the walls after all plywood is up
- Hook up all fixtures after paneling is up.
- Hook up panel box to pole outside.
- Need Alan for this one.
- Build front step (kitchen)
- Flooring
- Vanity sink (after flooring, so I will not have to cut special pieces for it)
- Cut hole into Vanity for waterlines / drain
- Position it and fasten it into place.
- Toilet (after flooring, so no special cutting required except for drain hole).
- Simply need to hook it up to waterline and sewer line.
- Finish Bathroom Closet
- Create cover for bottom
- Make shelves
- Add / finish door.
- Perhaps ¾” plywood with differently painted metal sheeting (same as walls) as a front.
- Pocket Door
- Paint and install
- Once this and all the bathroom fixtures are in, the bathroom will be complete
- Kitchen Counters (both sides)
- Structural supports (procure wood for this and the closet-wall at the same time?
- Possible drawer on far left side – already have slides.
- Finding and ordering the actual counter material
- Will require measurements (already have).
- Structural supports (procure wood for this and the closet-wall at the same time?
- Hook up sink after counter is in place
- Have sink
- Need faucet / drain.
- Bed
- Cow-wood finished and placed (along with some plywood) to make a suitable frame for mattress.
- Shelving / bin holders built into base.
- Will likely require some additional lumber, but may be able to use all from farm for this.
- Fix
- Straighten stairs leading up to porch
- Add railing
- Log chains switched with small chains presently outside
- Furnish
- Grill for front deck
- Mattress from oldhouse
- Desk
- Possibly use one from office near old-house.
- Same goes for chair from office near old-house.
- Tenant
- Jacob.
Final Note: As per the list, tomorrow I shall begin the caulking and trimming of Wall #6.