Living the pipe dream.
1/30/19: Building Summary: Today I began the process of putting together CPVC piping for the cold water line. This included […]
Living the pipe dream. Read More »
These posts include content and news in regard to living in a container home.
1/30/19: Building Summary: Today I began the process of putting together CPVC piping for the cold water line. This included […]
Living the pipe dream. Read More »
1/29/2019: Building Summary: Today I performed quite a variety of tasks. I started out with measuring, fitting, leveling, and attaching
Hammer Extender MK1. Read More »
1/28/19: Building Summary: Today I neatened up Jacobhouse by retrieving all the random pieces of wood I had laying about
The perfect p-trap. Read More »
1/27/2019: Building Summary: Today was planning day. Padre and I mapped out the best route for bringing in the water
Shelter from the rain. Read More »
1/26/18: Building Summary: Today I put together the sewer pipe incorrectly once more. This time everything was in the correct
1/25/19: Building Summary: Today I glued together most of the sewer line. I made the mistake of attaching the kitchen
Sewing together the sewer line. Read More »
1/24/2018: Building Summary: Today I prepared the sewer line for gluing. This consisted of knocking apart the pipes / pipe
1/23/19: Building summary: Today I fastened the sub-toilet/vanity frame down to the bathroom base, and I also applied a few
Fastening the sub-frame. Read More »
1/22/19: Building Summary: Today I went to town with Madre, and there, we obtained the Everbilt pocket door hardware/frame and
1/21/19: Building Summary: Today I measured, planned, marked, and cut the boards that will fasten the sub-toilet/vanity frame to the