More flashing for Wall #6 (and the DSL Jack).
6/5/19 (Above: Jacobhouse… flashing its posterior.) Building Summary: Today I started off the morning by adding flashing above the sliding […]
More flashing for Wall #6 (and the DSL Jack). Read More »
These posts include content and news in regard to living in a container home.
6/5/19 (Above: Jacobhouse… flashing its posterior.) Building Summary: Today I started off the morning by adding flashing above the sliding […]
More flashing for Wall #6 (and the DSL Jack). Read More »
6/4/19: (Above: The two strips of flashing I fastened to Wall #6.) Building Summary: This morning started off with my
Bright flashing, but dark light. Read More »
6/3/19 (Above: Wooden mounts to which the kitchen light shall be fastened.) Building Summary: Today I started off by preparing
Flooring ordered (and kitchen light mounts). Read More »
6/2/19 (Above: Early morning sun shining into Jacobhouse and reflecting from the stainless walls.) Building Summary: Today I started off
Fitting the soffit (and more measurements). Read More »
6/1/19: (Above: The office of Jacobhouse with all plywood back in place and with DSL line successfully run from front
And that’s why we glue the conduit. Read More »
5/31/19 (Above: The final floorboard is now fastened in place.) Building Summary: Today began with my measuring, marking, and cutting
Final floorboard (and internet supplies). Read More »
5/30/19 (Above: Despite the morning’s early tribulations, Jacobhouse’s sliding glass doors are now soundly in place.) Building Summary: Today I
The window wall (and an upside-down incident). Read More »
5/29/19 (Above: The postern side of Jacobhouse with the freshly stapled and taped vapor barrier.) Building Summary: Today I started
Taping Wall #6, and a frame within a frame. Read More »
5/25/19 (Above: Wall #6’s frame with plastic partly stapled on… Notice how all the shade falls to right side of
Waterproofing Wall #6 (and a leaping Wagyu). Read More »
5/27/19 (Above: This is a picture of Wall #6 from the inside. The doors were closed during a test to
Wall #6 fastened and fortified. Read More »