A day well-filled.
7/5/19 (Above: The office light, switch, and paneling installed on Closet-wall’s east side.) Preface: Today was quite a long and […]
A day well-filled. Read More »
These posts include content and news in regard to living in a container home.
7/5/19 (Above: The office light, switch, and paneling installed on Closet-wall’s east side.) Preface: Today was quite a long and […]
A day well-filled. Read More »
7/4/19 (Above: The first rivet I have ever installed within Jacobhouse. To think I was learning to how to take
First wall covered – a riveting experience. Read More »
7/3/19 (Above: The first piece of galvalume paneling cut for Wall #6 of Jacobhouse [the right side].) Building Summary: Today’s
Cutting the paneling (and new tools). Read More »
7/2/19 (Above: The fridge and oven are now in their final positions, waiting patiently to fulfill their functions.) Building Summary:
Utilizing old materials in new endeavors. Read More »
7/1/19 (Above: The Padre-fabricated connector between 1/2″ CPVC to the refrigerator.) Building Summary: Today, Padre and I started by testing
More miscellany (and power’s out again). Read More »
6/30/19 (Above: The fridge bridge allowing full access to Jacobhouse’s postern wall.) Building Summary: Today I started off by measuring,
Bathroom shelves (and the fridge bridge). Read More »
6/29/19 (Above: The now fully plywood’ed and shelved Closet-Wall.) Building Summary: Today I finished plywood’ing the Closet-Wall*. This included the
Shelving Closet-Wall (and a hidden market). Read More »
6/28/19 (Above: The closed-in closet wall with half of its shelves in place. I cut the other half slightly too
Closing in Wall #5 (and a return to the list). Read More »
6/27/19 (Above: One of the two pieces of plywood I cut for Wall #5. This is for the east side.)
Improving Wall #5 (and a shadeless shade). Read More »
6/26/19: (Above: Brace-boards, plywood, and shelving brackets all fastened in place.) Building Summary: Today I began by fastening on all
Shelving the closet-wall. Read More »