Vanity in place (and a delicious steak).
8/11/19: (Above: The fully caulked toilet and vanity sink in Jacobhouse. I’ll be neatening edges with a utility knife after […]
Vanity in place (and a delicious steak). Read More »
These posts include content and news in regard to living in a container home.
8/11/19: (Above: The fully caulked toilet and vanity sink in Jacobhouse. I’ll be neatening edges with a utility knife after […]
Vanity in place (and a delicious steak). Read More »
8/10/19 (Above: The toilet within Jacobhouse’s bathroom along with lengthened vanity sink stub-ups.) Building Summary: Today I began by hooking
Manual labor (and a flushing toilet). Read More »
8/9/19 (Above: An amassment of supplies for Jacobhouse belit by late-noon sun beam.) Building Summary: This morning at Jacobhouse, I
Lifting many things. Read More »
8/8/19 (Above: The toilet now installed within Jacobhouse’s bathroom.) Preface: Apologies in advance for any grammar / spelling discrepancies; it’s
8/7/19: (Above: The result of flange-morning.) Building Summary: I left old-house a bit late this morning due to rainy weather.
8/6/19 (Above: Bathroom pedestal, primed and painted.) Building Summary: Today, my morning was split between Jacobhouse construction, Master Blend maintenance*,
Priming the pedestal (and visitors to Jacobhouse). Read More »
8/5/19: (Above: Naturally finished lumber with the first coat of polyurethane in place.) Building Summary: This morning was a lengthy
A bovine masterpiece. Read More »
8/4/19 (Above: Me cutting wood for the Jacob-bed.) Building Summary: Today I, with Padre’s help, completed the bed’s structure and
8/3/19 (Above: A picture of Jacobhouse’s bedroom [taken from the west].) Building Summary: Today began with Padre and I getting
Jacob-bed (and Quail & Mushroom Stew). Read More »
8/2/19: (Above: Bathroom closet with shelves in place. The trim is not yet fastened because I was testing its appearance.
Painting shelves, digging holes, and revising plans. Read More »