Painted doors, and no rats. A good day.
9/10/19 (Above: The freshly painted interior doors for Jacobhouse. Brown-door shall be used for the spice-cupboard, and Turquoise-door will be […]
Painted doors, and no rats. A good day. Read More »
These posts include content and news in regard to living in a container home.
9/10/19 (Above: The freshly painted interior doors for Jacobhouse. Brown-door shall be used for the spice-cupboard, and Turquoise-door will be […]
Painted doors, and no rats. A good day. Read More »
9/9/19 (Above: An image taken to cause perplexity within the viewer. Read on to find out what is going on
Another incursion. Read More »
9/8/19 (Above: The fully floored kitchen-to-bedroom hall.) Building Summary: This morning’s construction activities consisted solely of flooring Jacobhouse. I began
The bathroom floor. Read More »
9/7/19 (Above: The half-floored hallway of Jacobhouse.) Building Summary: This morning began with a little bit of cattle activity and
The hallway (and the clock). Read More »
9/6/19 (Above: Jacobfeet enjoying the new floor in Jacobhouse. I could have rotated the picture to a more proper orientation,
9/5/19 (Above: The office, fully floored.) Building Summary: Today I began morning activities by filling eight Moo-Magic manure bags in
9/4/19 (Above: The freshly installed drain pipes / p-trap beneath the kitchen sink.) Building Summary: Today I began Jacobhouse activities
All piping in, all p-traps filled. Read More »
9/3/19 (Above: Kitchen sink glued and caulked. Held down / in-place via heavy boxes of hinges and drawer slides.) Building
Bastion (and the too-tall faucet). Read More »
9/2/19 (Above: An image of the process by which I shrunk the kitchen sink’s orifice in Jacobhouse.) Building Summary: This
Shrinking for the sink (and chocolate chip cakies). Read More »
9/1/19 (Above: The concrete countertop within Jacobhouse.) Building Summary: Today I started off by unloading various container/studio/office paraphernalia* from the
The concrete countertop (and ‘Why?’). Read More »