From a Madre fan.
1/26/18: Building Summary: Today I put together the sewer pipe incorrectly once more. This time everything was in the correct […]
1/26/18: Building Summary: Today I put together the sewer pipe incorrectly once more. This time everything was in the correct […]
1/25/19: Building Summary: Today I glued together most of the sewer line. I made the mistake of attaching the kitchen
Sewing together the sewer line. Read More »
1/24/2018: Building Summary: Today I prepared the sewer line for gluing. This consisted of knocking apart the pipes / pipe
1/23/19: Building summary: Today I fastened the sub-toilet/vanity frame down to the bathroom base, and I also applied a few
Fastening the sub-frame. Read More »
1/22/19: Building Summary: Today I went to town with Madre, and there, we obtained the Everbilt pocket door hardware/frame and
1/21/19: Building Summary: Today I measured, planned, marked, and cut the boards that will fasten the sub-toilet/vanity frame to the
1/20/19: Building Summary: Today, I used the boards I cut yesterday to build a frame. This frame will lift the
1/19/2019: Building Summary: Today I measured the appliances’ (and toilet’s) true dimensions to make sure they would all fit in
Andante non troppo e molto maestoso. Read More »
1/18/19: Building Summary: Today’s primary task was making a list of materials for Home Depot, Lowe’s, and Sparr Farm &
1/17/2019: Building Summary: Today I put up, leveled, and fastened in four of the six ‘shelf posteriors’ I cut yesterday.