Supply run day.
1/22/19: Building Summary: Today I went to town with Madre, and there, we obtained the Everbilt pocket door hardware/frame and […]
1/22/19: Building Summary: Today I went to town with Madre, and there, we obtained the Everbilt pocket door hardware/frame and […]
1/21/19: Building Summary: Today I measured, planned, marked, and cut the boards that will fasten the sub-toilet/vanity frame to the
1/20/19: Building Summary: Today, I used the boards I cut yesterday to build a frame. This frame will lift the
1/19/2019: Building Summary: Today I measured the appliances’ (and toilet’s) true dimensions to make sure they would all fit in
Andante non troppo e molto maestoso. Read More »
1/18/19: Building Summary: Today’s primary task was making a list of materials for Home Depot, Lowe’s, and Sparr Farm &
1/17/2019: Building Summary: Today I put up, leveled, and fastened in four of the six ‘shelf posteriors’ I cut yesterday.
1/16/2019: Building Summary: Today I measured, cut, and pre-drilled holes into the boards that will make up the back of
The Shelves’ Posteriors Read More »
1/15/2019: Summary: Today I neatened up the inside of Jacobhouse and finished adding frame boards to the closet’s internal structure
Container closet construction. Read More »
1/14/19: Summary: Today I measured, cut boards for, and began constructing the bathroom closet-space. Full description: Today I went down
Bathroom Closet Construction (Begins) Read More »
1/13/2019: Summary: Today I put up three more angle-ended 2x4s in place above the four I fastened in yesterday. After
Three* more boards for wall four. Read More »