Stubbing up, day 2.
2/2/19: Building Summary: Today I did exactly what I said I was going to do at the end of yesterday’s […]
Stubbing up, day 2. Read More »
2/2/19: Building Summary: Today I did exactly what I said I was going to do at the end of yesterday’s […]
Stubbing up, day 2. Read More »
2/1/2019: Building Summary: Today I began stubbing up the piping for Jacobhouse’s cold water line. This consisted of measuring and
Stubbing up, day 1. Read More »
1/31/19: Building Summary: Today I measured, cut, and pieced together most of the hot water CPVC line. I also retrieved
They make ’em smaller than they used to. Read More »
1/30/19: Building Summary: Today I began the process of putting together CPVC piping for the cold water line. This included
Living the pipe dream. Read More »
1/29/2019: Building Summary: Today I performed quite a variety of tasks. I started out with measuring, fitting, leveling, and attaching
Hammer Extender MK1. Read More »
1/28/19: Building Summary: Today I neatened up Jacobhouse by retrieving all the random pieces of wood I had laying about
The perfect p-trap. Read More »
1/27/2019: Building Summary: Today was planning day. Padre and I mapped out the best route for bringing in the water
Shelter from the rain. Read More »
1/26/18: Building Summary: Today I put together the sewer pipe incorrectly once more. This time everything was in the correct
1/25/19: Building Summary: Today I glued together most of the sewer line. I made the mistake of attaching the kitchen
Sewing together the sewer line. Read More »
1/24/2018: Building Summary: Today I prepared the sewer line for gluing. This consisted of knocking apart the pipes / pipe