Closet-wall, Day 3. (The Wasp)
2/12/19: Building Summary: Today I measured, cut, and fastened supports to the closet-wall. In doing so, I made two wall […]
Closet-wall, Day 3. (The Wasp) Read More »
2/12/19: Building Summary: Today I measured, cut, and fastened supports to the closet-wall. In doing so, I made two wall […]
Closet-wall, Day 3. (The Wasp) Read More »
2/11/2019: Building Summary: Today I began the process of putting together Wall #5. This consisted of using a skillsaw to
Wall #5, Day 2. (Board games.) Read More »
2/10/19: Building Summary: Today I began the construction process on Wall #5, otherwise to be known as wardrobe-wall. I started
2/9/2019: Building Summary: Today was yet another day of planning and preparation. I started off the morning by clearing away
2/8/2019: Building Summary: Today was a cleaning and planning day. I started off by tidying up the mess I left
More planning (and delicious sandwiches). Read More »
2/7/19: Building Summary: Today I found that I could put the internet conduit all the way on the north side
2/6/19: Building Summary: Today I performed quite a variety of pipe related tasks. I finished gluing the cold/hot water lines
Orange Glue, Day 3. Read More »
2/5/19: Building Summary: Today I glued together the last CPVC connection in the bathroom and moved on to the kitchen
Orange Glue, Day 2. Read More »
2/4/19: Building Summary: Today I carried out the plan Padre and I devised yesterday in regard to the extra ‘solar
Orange glue, Day 1. Read More »
2/3/2019: Building Summary: Today I stubbed up the cold water intake line for the hot water heater, and I researched
Stubbing up, Day 3. Read More »