I conduit!
2/7/19: Building Summary: Today I found that I could put the internet conduit all the way on the north side […]
2/7/19: Building Summary: Today I found that I could put the internet conduit all the way on the north side […]
2/6/19: Building Summary: Today I performed quite a variety of pipe related tasks. I finished gluing the cold/hot water lines
Orange Glue, Day 3. Read More »
2/5/19: Building Summary: Today I glued together the last CPVC connection in the bathroom and moved on to the kitchen
Orange Glue, Day 2. Read More »
2/4/19: Building Summary: Today I carried out the plan Padre and I devised yesterday in regard to the extra ‘solar
Orange glue, Day 1. Read More »
2/3/2019: Building Summary: Today I stubbed up the cold water intake line for the hot water heater, and I researched
Stubbing up, Day 3. Read More »
2/2/19: Building Summary: Today I did exactly what I said I was going to do at the end of yesterday’s
Stubbing up, day 2. Read More »
2/1/2019: Building Summary: Today I began stubbing up the piping for Jacobhouse’s cold water line. This consisted of measuring and
Stubbing up, day 1. Read More »
1/31/19: Building Summary: Today I measured, cut, and pieced together most of the hot water CPVC line. I also retrieved
They make ’em smaller than they used to. Read More »
1/30/19: Building Summary: Today I began the process of putting together CPVC piping for the cold water line. This included
Living the pipe dream. Read More »
1/29/2019: Building Summary: Today I performed quite a variety of tasks. I started out with measuring, fitting, leveling, and attaching
Hammer Extender MK1. Read More »