Lightening the moo’d.
2/27/2019: Building Summary: Today I went on a supply/research run into town with Madre. There, I acquired the Cortex fasteners […]
Lightening the moo’d. Read More »
2/27/2019: Building Summary: Today I went on a supply/research run into town with Madre. There, I acquired the Cortex fasteners […]
Lightening the moo’d. Read More »
2/26/19: Building Summary: Today I neatened up around the outside of Jacobhouse. This included picking up wood scraps, trimming wild
Yard-work around Jacobhouse. Read More »
2/25/19: Building Summary: Today I added the top support to the postern portion of the closet in Wall #5. I
More closet work. (And an interrupting cow) Read More »
2/24/19: Building Summary: Today I revised my strategy for straightening up the closet-wall. It is still very close to the
The vacuum chamber. Read More »
2/23/19: Building summary: Today I cut the boards I marked yesterday, and I put them together as if they were
Straightening up the closet, Day 1. Read More »
2/22/19: Building summary: Today was more or less a planning day, but I did still get a few things done.
More planning, day ∞. (Wag-yu-doin?) Read More »
2/21/19: Building Summary: Today I obtained, measured, and cut the 2x4s that were to become new ‘floor-boards’ in Jacobhouse. I
Floor/more Boards. (and a high-light) Read More »
2/20/19: Building Summary: Today I performed quite a wide variety of tasks, the most major of which included: turning over
Electrical planning, day 4. (Container coagulate) Read More »
2/19/19: Building Summary: Today I bolstered the frame extension at the front of Jacobhouse (it is now attached by more
Electrical planning, day 3. (Tape times.) Read More »
2/18/19: Building Summary: Today I started off by using a spade bit to ‘chew’ out a few small sections of